Local

Kennewick Irrigation District lining project begins near Creekstone Drive

A Kennewick Irrigation District worker operates an excavator Monday near a concrete foot bridge over the Division 4 canal near Creekstone Drive.
A Kennewick Irrigation District worker operates an excavator Monday near a concrete foot bridge over the Division 4 canal near Creekstone Drive. Tri-City Herald

A Kennewick Irrigation District worker operates an excavator Monday near a concrete foot bridge over the Division 4 canal near Creekstone Drive and South Irving Street in Kennewick. He is preparing for a lining project of a 1.1 mile stretch of earthen canal.

This story was originally published November 14, 2016 at 8:18 PM with the headline "Kennewick Irrigation District lining project begins near Creekstone Drive."

Get one year of unlimited digital access for $159.99
#ReadLocal

Only 44¢ per day

SUBSCRIBE NOW