Local

On this day: Sept. 19, 1941

Installation of a huge 110,000 volt transformer was completed this week at the Hanford substation. Because of the tremendous size of the tank, core and coils of the transformer, railroad officials had to check clearance of every bridge and tunnel between St. Louis and Hanford before routing the equipment.

  Comments